Weekly Construction Update: July 29, 2022

Read below to find out all about our current and upcoming construction projects, and road closures for the upcoming week.

View a list of all of our upcoming construction projects, see our interactive Infrastructure Project Dashboard and check current road and bridge closures.

You can also visit our Facebook and Twitter pages for up-to-date Road Commission information.

Road Resurfacing: 68th Ave. between Leonard St. and Randall St.

WHEN: Starting on Sunday night, July 31.

WHERE: 68th Ave., Leonard St. to Randall St., Polkton Twp.

WHY: Road Resurfacing

BACKGROUND: Starting on Sunday night, July 31, the Ottawa County Road Commission (OCRC) will begin a resurfacing project on 68th Ave. between Leonard St. and Randall St. in Polkton Township.

This work is expected to take approximately 4 weeks to complete, however, all dates are tentative and subject to change due to weather conditions. A portion of the project will take place at night between Randall St. and the landfill.

Please be advised that the road will remain open to traffic during this project, however there will be periodic temporary lane closures. Traffic will be maintained under flag control. Please drive with care and give yourself extra time to get to your destination.

Road Closure: Perry St. at 104th Ave., Holland Twp.

WHEN: Monday, Aug. 1-Friday, Aug. 26 (est.)

WHERE: 104th Ave. at Perry St., Holland Township

WHY: Culvert Replacement/Water Main

BACKGROUND: Starting on Monday, Aug. 1, 2022, the Ottawa County Road Commission will be closing the Perry St. at 104th Ave. in all four directions in Holland Township for a culvert replacement project and a permitted water main project.

This work is expected to take approximately several weeks to complete, and is tentatively estimated to be finished Friday, Aug. 26, 2022. Please note, however, that all dates are tentative and subject to change due to weather conditions and other factors that may arise.

TRAFFIC IMPACT: The intersection of 104th Ave. and Perry St. will be closed to all traffic from all four directions.

Perry St. will be closed to thru traffic from 106th Ave. to 96th Ave.

The detour route for Perry St. will consist of: 106th Ave./I-196 BL/96th Ave.

104th Ave. will be closed to thru traffic from BL-196 to Adams St.

The detour for 104th Ave. will consist of: I-/96th Ave./Adams St.

Road Closure: 40th Ave., Riley St. to Byron Rd., Jamestown Twp.

WHEN: Aug. 1-3

WHERE: 40th Ave., Riley St. to Byron Rd., Jamestown Twp.

WHY: Culvert Replacement

BACKGROUND: Starting on Monday, Aug. 1, the Ottawa County Road Commission (OCRC) will begin a culvert replacement project on 40th Ave. between Byron Rd. and Riley St. in Jamestown Township.

This work is expected to take approximately 3 days to complete, however, all dates are tentative and subject to change due to weather conditions.

DETOUR: Byron Rd./32nd Ave./Riley St.

Road Closure: Squires Rd., Harding St. to Gooding St., Chester Twp

WHEN: Starting on Monday, Aug, 1, 2022

WHERE: Squires Rd., Harding St. to Gooding St., Chester Twp.

WHY: Bridge Deck Replacement

BACKGROUND: Starting on Monday, the Ottawa County Road Commission (OCRC) will be closing Squires Rd. between Harding and Gooding streets in Chester Township until further notice for a bridge deck replacement project.

Please be advised that the road will be closed to thru traffic. As this is a gravel road and there will be no posted detour.

Road Closures

TOWNSHIPSTREETSEGMENTREASONRESPONSIBLE
AUTHORITY
EST.
DURATION
Port SheldonBlair St.152nd Ave. to 144th Ave.Culvert ReplacementOCRCSept. 18-Oct. 6
Blendon96th Ave.Port Sheldon St. to Tyler St.Culvert ReplacementOCRCSept. 18-27
AllendaleFillmore St.72nd Ave. to 96th Ave.Culvert ReplacementOCRCSept. 18-26
Allendale52nd Ave.Fillmore St. to Pierce St.Sanitary SewerPermitAug. 14-Oct. 13

Road Resurfacing

TOWNSHIPSTREETSEGMENTEST. DURATION
Zeeland64th Ave.Byron Rd. to Chicago Dr.Sept. 5-28
Holland144th Ave.Shadybrook Dr. to Riley St.Aug. 21-Sept. 22
Holland8th St./Chicago Dr.U.S. 31 to City LimitsJuly 10-Nov. 1

Subdivision Resurfacing

TOWNSHIPEST. DURATION